Back to HistoryCake Driving Tour - Highway 14 and the 395 - Welcome and OverviewThe Van Norman dam was built in 1913 to create a reservoir higher than the san fernando valley floor. It was the then endpoint for the owens valley aqueduct.
In the app, this story plays on its own as you reach this spot. This page is the preview.
See the full tourListen
In the app, the full narration plays when you're on location.
The story
The Upper Van Norman Dam initially was constructed with 42 feet of hydraulic fill in 1913. In 1922, the dam was raised 18 feet with rolled fill.
The Lower Van Norman Dam was constructed with hydraulic and rolled fill. Hydraulic fill height was about 102.4 feet (31.2 m), while rolled fill was added at least five times in the dam's history, each time increasing the dam's height, totaling 39.6 feet (12.1 m) rolled fill. The last addition was made in 1929.
On the route
In the app, this stop triggers as you arrive.
Stop 1 of 57
Almost here
The History Cake app is in the final stretch. Leave your email and we'll send one note when this story can play for you on the spot.
One email at launch. No worries, no spam.